国产裸体美女永久免费无遮挡,解开人妻的裙子猛烈进入,人世间电视剧免费观看全集完整版,波多野结衣在线视频

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運行維護(hù)!

沼氣凈化裝置的運行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時,應(yīng)每天排除冷凝水,排水時應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時,應(yīng)及時補(bǔ)充循環(huán)營養(yǎng)液。塔內(nèi)填料應(yīng)6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計要求時應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時,應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時,應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時更換,更換脫硫劑時操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
亚洲国产精品美女久久久久av| 高柳の肉嫁动漫在线观看| 性色av乱码一区二区三区| 欧美人与性动交ccoo| 妓院里的中国姑娘| 被多个男人调教奶头玩奶头| 东京热无码免费a片免费下载| 99久久蜜av毛片毛片正在| 秋霞成人午夜鲁丝一区二区三区| 精品国产一区二区三区四区| 日韩精品无码一区| 性裸交a片一区二区三区| 黑人刚破完处就三p| 国产精产国品一二三产区区别| 国产乱妇无码大片在线观看| 国产97人人超碰cao蜜芽| 国产亚洲精品精华液| 欧美av在线观看| 日本丰满熟妇bbxbbxhd| 少妇性饥渴无码a区免费| 当着夫的面被夫上司玩弄| 成品网站w灬源码1688小说| 精品人妻无码一区二区三区蜜桃一| 午夜不卡久久精品无码免费| 一女侍七夫巨h双修| 寡妇的大乳bd高清中文| 亚洲爆乳无码精品aaa片蜜桃| 一路向西在线观看完整版| 久久亚洲一区二区三区四区五区| 中国体育生gary飞机| 被迫穿丁字内裤带着震蛋出门小说| 亚洲av天堂av在线成人播放| 最近2019中文字幕电影免费看| a片高潮抽搐揉捏奶头视频| 久久久综合香蕉尹人综合网| 又大又粗又长又猛a片蜜桃| 国产欧美日韩一区二区三区| 人妻丰满熟妇av无码区app| 日日噜噜夜夜狠狠久久人人| 青苹果乐园在线观看| 寡妇玩xxxxxx猛男|